Here's a range of successful projects that highlight my expertise and commitment to quality construction. Whether you're looking to renovate, remodel, or embark on a new build, I bring precision, creativity, and professionalism to every project. Explore my past work to see how I transform ideas into exceptional spaces tailored to meet your needs and exceed your expectations.

P1

Belconnen Backyard Remodel

The project began with the removal of old pavers and sleepers that previously formed the retaining walls. The backyard was then excavated to create the necessary space for the new deck framing. Following the excavation, the construction of the deck's framework, including the stairs, was completed. Finally, decking boards were laid, and the side framing of the deck was clad, giving the structure a polished and cohesive appearance.

P2

Amaroo Pergola Replacement

The pergola roof was severely damaged by hail, prompting the client to seek our expertise for a replacement.

P3

Torrens Kitchen Remodel

The old kitchen was removed, and new walls were constructed to create a walk-in pantry and a dedicated space for the fridge. The kitchen installation was handled by a separate contractor.

P4

Holt Front Patio Deck Upgrade

The construction of the new deck frame over the existing concrete patio, followed by the installation of a new deck on top.

P5

Watson Gate Restoration

The project began with the removal of the old gate frame and palings. The gate frame was then repainted, and new hinges and palings were installed to complete the update.

P6

Blue Mountains Shed Construction

The construction of the 6m x 10m shed, included building the shed frames, cladding the structure with Colorbond, and installing a roller door and flashings to complete the build.

P7

Deakin Engineered Flooring

This project involved the installation of engineered timber flooring. Each board was carefully glued down using trowel-applied floor adhesive, ensuring a secure and durable finish.

P8

Manteena & Dept of Design Office Fitout

The fitout involved demolishing the wall between two office spaces to create a larger, open area. A mezzanine floor was then constructed in the ceiling space to provide additional storage, complete with an access ladder. New ceiling installation was carried out, and walls and ceiling were insulated to reduce noise. Finally, plasterboard was installed on both the walls and ceiling to finish the space.

P9

Torrens Master Bedroom
and Walk-in Robe Remodel

This project began with the removal of the old bedroom and walk-in robe doors and walls. New walls were then constructed, and cavity sliding doors were installed in both rooms to complete the update.